期刊文献+

Summary of Mechanical Group Work in 2017

2017年机械组工作概要
下载PDF
导出
摘要 In the year 2017,Mechanical group is responsible for both maintenance HIRFL system and tasks from new facilities and projects,Such as HIAF,CiADS in Guangdong province,LEAF instrument project,and SESRI from Harbin Institute of Technology.All those works need us to design,analysis,maintenance of mechanic structure of accelerator components.In addition,drawing layouts for new facility and part of design works of civil construction have been done.
机构地区 不详
出处 《IMP & HIRFL Annual Report》 2017年第1期267-271,共5页 中国科学院近代物理研究所和兰州重离子研究装置年报(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部