期刊文献+

重点局站核心机楼应急发电抢修效率提升探讨

Discussion on the Efficiency Improvement of Emergency Power Generation Repair for Core Machine Building of Key Stations
下载PDF
导出
摘要 基于江苏电信连云港分公司多年来应急发电抢修实践,遵循全面质量管理(QC)的思路与方法,对通信局站尤其是重点局站核心机楼的应急发电抢修全过程影响因素进行分析,总结了提升应急发电抢修效率的一些方法与技巧,供同行借鉴参考。 Based on the emergency power generation repair practice of Lianyungang Branch of Jiangsu Telecom for many years and following the thoughts and methods of Total Quality Management(QC),this paper analyses the influencing factors of the whole process of emergency power generation repair in communication bureaus,especially in the core building of key bureaus,and summarizes some methods and techniques to improve the efficiency of emergency power generation repair,which can be used for reference by peers.
作者 李东风 LI Dong-feng(Lianyungang Branch of China Telecom Co.,Ltd.,Lianyungang 222000,China)
出处 《通信电源技术》 2020年第S01期91-95,共5页 Telecom Power Technology
关键词 移动发电车 车载发电机 应急供电接口 mobile electric vehicle vehicle-mounted generator emergency power supply interface
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部