摘要
本文介绍了核心通信机房动力系统提升健壮性的措施,按照“三年三步走”的原则,分别从规划、建设、维护三个层面制定三年内分步、规范实施的年度工作思路和计划。重点强调了三个层面之间的紧密协同,处理当前网络隐患与中长期规划要有机结合,而且系统建设要有适度超前的意识,坚决杜绝基础设施的“需求倒逼、短线操作、盲目上马、建后即拆”现象,真正提升网络运行水平。
This paper introduces the measures to improve the robustness of the power system of the core communication room.According to the principle of“three steps in three years”,the annual working ideas and plans are made from three levels of planning,construction and maintenance,which are step-by-step and standardized in three years.It emphasizes the close coordination among the three levels.The handling of current network hidden dangers should be organically combined with medium-and long-term planning.Moreover,the system construction should have a moderately advanced awareness,and the phenomenon of“demand driven,short-term operation,blind launch,and demolition after construction”should be resolutely put an end to,so as to truly improve the network operation level.
作者
张永红
高建勋
李斯亮
杨串兄
左强
ZHANG Yong-hong;GAO Jian-xun;LI Si-liang;YANG Chuan-xiong;ZUO Qiang(China Unicom Gansu Branch,Lanzhou 730050,China)
出处
《通信电源技术》
2020年第S01期263-266,共4页
Telecom Power Technology
关键词
通信
电源
健壮性
提升
communication
power supply
robustness
improve