摘要 以夹岩水利枢纽面板堆石坝工程为例,主要介绍在泥质粉砂地质条件下进行帷幕灌浆生产性试验过程,对孔位布置、灌浆材料、施工工艺、特殊情况处理及试验成果进行分析,并提出最终帷幕灌浆施工设计方案及其施工参数优化建议,为后期坝段及其他部位的帷幕灌浆提供了有效参考依据。 Taking the rockfill dam with face slab project of Jiayan Hydro Project as an example,this paper mainly introduces the productive test process of curtain grouting under the geological conditions of argillaceous silt,analyzes the hole layout,grouting material,construction technology,special treatment and test results,and puts forward the final curtain grouting construction design scheme and its construction parameter optimization suggestion,which provides an effective reference for the curtain grouting of the later dam section and other parts.
作者 袁宗洪 袁晓楠 严哲辉 YUAN Zonghong;YUAN Xiaonan;YAN Zhehui(Guizhou Water Conservancy Investment Group Co.,Ltd.,Guiyang,Guizhou,550081)
出处 《红水河》 2020年第6期53-57,共5页 Hongshui River
关键词 帷幕灌浆 灌浆试验 分析 面板堆石坝 curtain grouting grouting test analysis rockfill dam with face slab
  • 相关文献

同被引文献11

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部