摘要
在对丰满大坝新坝真空激光变形监测系统进行布设,着重研究解决激光管道的铺设及测点底板铺设过程中的地球曲率改正、管道铺设过程中的有效量程的控制调整、真空管道的密封和检漏及设备调试等技术问题。
The layout of vacuum laser deformation monitoring system for Fengman dam is introduced in this paper.The technical problems of Earth curvature correction,effective range control adjustment,sealing and leak detection of vacuum pipeline and equipment debugging in the course of laying laser pipeline and measuring point bottom plate are mainly studied.
作者
李作光
LI Zuoguang(Fengman Hydropower Plant,Jilin 132108,China)
出处
《水电与抽水蓄能》
2020年第6期93-96,共4页
Hydropower and Pumped Storage
关键词
丰满大坝新坝
真空激光变形监测系统
土建施工
设备调试
Fengman Dam New Dam
Vacuum L aser Deformation Monitoring System
civil construction
equipment debugging