期刊文献+

大型贯流式水轮机安装高程确定浅析 被引量:2

Preliminary Analysis on Determination of Installation Elevation of Large-scale Tubular Turbine
下载PDF
导出
摘要 简要介绍了《水电站机电设计手册》、《水轮机设计手册》以及美国相关标准规定的大型贯流式水轮机吸出高度、安装高程计算方法和使用建议。通过分析大型贯流式水轮机空化特性,给出选择大型贯流式水轮机空化基准面的建议。结合贯流式水轮机运行特点,通过对比设计手册、相关标准以及典型水电站空化安全系数K的取值,提出空化安全系数K取值建议;最后提出了下游设计尾水位取值建议以及安装高程确应考虑的其他因素。 The article briefly introduces the calculation methods and usage suggestions of the suction height,installation height of largescale tubular turbines specified in the"Electrical and Mechanical Design Manual of Hydropower Stations","Water Turbine Design Manual"and relevant American standards.By analyzing the cavitation characteristics of large-scale tubular turbines,suggestions for selecting the cavitation datum level of large-scale tubular turbines are given.Combining the operating characteristics of the tubular turbine,and comparing the design manual,relevant standards and the value of the cavitation safety factor K of typical hydropower station,the value of the cavitation safety factor K is proposed;finally,the value of the downstream design tail water level and other factors to be considered in the determination of the installation elevation are proposed.
作者 王龙 刘国峰 张子艳 WANG Long;LIU Guofeng;ZHANG Ziyan(Powerchina Northwest Engineering Corporation Limited,Xi'an 710065,China)
出处 《西北水电》 2020年第S02期74-79,共6页 Northwest Hydropower
关键词 贯流式水轮机 空化 吸出高度 尾水位 安装高程 tubular turbine cavitation suction height tail water level installation elevation
  • 相关文献

参考文献8

二级参考文献6

  • 1刘强.灯泡贯流式机组运行稳定性分析[J].水力发电,2007,33(7):63-65. 被引量:13
  • 2DL/T5186-2004,水力发电厂机电设计规范[S].
  • 3美国土木工程学会,水利水电规划设计总院、水利水电科学研究院,译.水电工程规划设计土木工程导则:第三卷-厂房及有关课题[R].,1989.
  • 4田树棠.贯流式水轮发电机组的实用技术——设计·施工安装·运行检修[M]北京:中国水利水电出版社,2010.
  • 5杜荣幸.石虎塘三叶片、四叶片贯流式水轮机选型设计和模型试验[A]北京:中国水利水电出版社,2011.
  • 6田树棠,崔涛.贯流式水轮机应用的优化[J].西北水电,2012(S01):122-126. 被引量:5

共引文献13