由设计院牵头EPC项目的造价控制与管理 被引量:9

Cost Control and Management of EPC Projects Led by the Design Institute
下载PDF
导出
摘要 设计院牵头的EPC总承包模式因其能最大化地发挥设计的主导作用,减少设计方与施工方在配合工作时的扯皮环节、缩短工程的建设周期,节约项目投资而备受市场欢迎。但与传统的模式相比,因其跨度大、流程长,使得各方对投资的控制变得更加复杂。文章立足项目建设全过程,提出如何在设计院牵头的EPC模式下做好造价管理与控制。 The EPC general contracting model led by the design institute is welcomed by the market because it can make full advantage of the leading role of design,reduce the wrangling between the design contractor and the construction contractor,shorten the construction period of the project,and save project investment.However,compared with the traditional model,due to its large time span and long process,the control of investment by all parties has become more complicated.Based on the whole process of project construction,the article proposes how to manage and control the cost under the EPC model led by the design institute.
作者 李星 LI Xing(Powerchina Northwest Engineering Corporation Limited,Xi'an 710065,China)
出处 《西北水电》 2020年第S02期136-137,148,共3页 Northwest Hydropower
关键词 EPC 设计院 造价控制 造价管理 EPC design institute cost control cost management
  • 相关文献

参考文献4

二级参考文献13

共引文献11

同被引文献38

引证文献9

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部