期刊文献+

分布式光伏发电系统接线方案优化 被引量:8

Optimization of wiring scheme for distributed photovoltaic power generation system
下载PDF
导出
摘要 近年来,光伏发电行业发展迅猛,装机容量经历了爆发式的增长。由于国家政策的影响,鼓励发展分布式光伏发电,分布式光伏发电也得到了快速发展。低压并网的分布式光伏发电系统一般采用组串式逆变器,通过低压400 V系统并入电网,光伏发电系统中各设备的布置、电缆的选型对于整个光伏发电系统的投资具有决定性的作用。对分布式光伏发电系统中设备布置及电缆选型进行了分析及推导计算,编制了光伏系统接线方案优化计算书,能自动计算不同光伏发电系统接线方案的各项指标,并通过实际工程算例说明了计算书的可行性。 In recent years,the industry of photovoltaic power generation has developed rapidly,of which the installed capacity has experienced explosive growth.The development of distributed photovoltaic power generation is supported by national policies,achieving a high growth rate.The string inverters are generally used in distributed photovoltaic power generation systems connected to 400 V low voltage grid.The arrangement of various equipment and selection of cable in the photovoltaic power generation system plays an important role in the investment of the entire photovoltaic power generation system.The layout of equipment and selection of cable in the distributed photovoltaic power generation system are analyzed and deduced,and the optimization calculation book of the wiring scheme of photovoltaic system is compiled.The index parameters of different wiring schemes can be automatically calculated.The feasibility of the optimization calculation book is illustrated by a practical engineering example.
作者 翟学 郭紫昱 曲名新 吴俊鹏 陈宝平 ZHAI Xue;GUO Ziyu;QU Mingxin;WU Junpeng;CHEN Baoping(Power China Hubei Engineering Co.,Ltd.,Wuhan 430040,China;State Grid Economic and Technological Research Institute Co.,Ltd.,Beijing 10010,China;State Grid Henan Electric Power Company Zhengzhou Power Supply Company,Zhengzhou 45000,China;Central Southern China Electric Power Design Institute of China Power Engineering Consulting Group Co.,Ltd.,Wuhan 430040,China)
出处 《电气应用》 2020年第12期87-93,共7页 Electrotechnical Application
关键词 分布式光伏发电 设备布置 接线方案优化 优化计算书 distributed photovoltaic power generation layout of equipment optimization of wiring scheme optimized computation book
  • 相关文献

参考文献8

二级参考文献24

  • 1GB/T3956-2008电缆的导体[S],2008.
  • 2Renewable Energy Policy. RENEWABLES 2014 GLOBAL STATUS REPORT [ M ]. REN21 Secretariat c/o UNEP, 2014.
  • 3水利电力郝两北电力没计院.电气设计一次手册[M].中国电力出版社,1986.
  • 4MAKI A, VALKEALAHTI S. Power losses in long string and par- allel-connected short strings of series-connectedsilicon-based pho- tovoltaic modules due to partial shading conditions [J]. IEEE Transactions on Energy Conversation, 2012,27(1): 173 - 183.
  • 5KHAJEHODDIN S A, BAKHSHAI A, JAIN P. A novel topology and control strategy for maximum power point trackers and mul- ti-string grid- connected PV inverters [C]//Proccedings of Twen- ty-Third Annual IEEE. Austin,Texas,USA: APEC,2008.
  • 6RAMAPRABHA R, MATHUR B L. A comprehensive review and analysis of solar photovoltaic array configurations under partial shaded conditions[J]. International Journal of Photoenergy,2012, 8246(2): 1-16.
  • 7SYAFARUDDIN,KARATEPE, HIYAMA. Artificial neural net- work-polar coordinated fuzzy controller based maximum power point tracking control under partially shaded conditions[J]. IET Re- newable Power Generation, 2009,3(2): 239-253.
  • 8刘邦银,梁超辉,段善旭.直流模块式建筑集成光伏系统的拓扑研究[J].中国电机工程学报,2008,28(20):99-104. 被引量:63
  • 9熊燕华.基于直角距离的设施选址优化问题[J].中国制造业信息化(学术版),2008,37(11):15-16. 被引量:3
  • 10肖景良,徐政,林崇,何少强.局部阴影条件下光伏阵列的优化设计[J].中国电机工程学报,2009,29(11):119-124. 被引量:89

共引文献13

同被引文献33

引证文献8

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部