摘要
本文以印尼某电厂某海港码头工程钢管桩桩头与上部结构连接设计为例,介绍海港钢管桩桩头采用桩芯钢筋混凝土与上部结构连接方式注意事项,供类似工程借鉴。
Based on the design for connecting the top of steel pipe pile with the upper structure in a power plant berth project in Indonesia,the precautions for connecting the top of steel pipe pile with the upper structure by using pile core reinforced concrete are introduced in detail,which will provide a reference for similar projects.
作者
邓振洲
黄胜
Deng Zhenzhou;Huang Sheng(CCCC Second Harbor Consultants Co.,Ltd.,Wuhan Hubei 430071,China)
出处
《港工技术》
2020年第6期45-47,共3页
Port Engineering Technology
关键词
钢管桩
桩头连接方式
桩芯钢筋混凝土长度确定
steel pipe pile
pile end connecting way
determination of length of pile core reinforced concrete