新型透水护岸构件水上高效施工工艺探讨

Efficient Construction Technology for New Permeable Revetment Structure
下载PDF
导出
摘要 为解决构件结构耐久性差、在水上群抛施工中效率低、定位质量差的问题,本文在对结构进行优化的基础上,依据水上抛投流程对施工工艺进行探讨。创新性地提出了采用多架位自动脱钩装置进行精准定位抛投作业的施工方案,大大提高了施工效率,同时避免了人员甲板作业,降低了安全隐患。 In order to improve the durability,the efficiency of waterborne casting construction and the positioning quality of four-face and six-side permeable structure,the construction technology is studied according to the optimized structure and the waterborne casting process.An innovative construction plan is proposed,that is,the automatic multi-frame de-coupler is used to precisely position the casting of revetment structures.The above application supports high efficiency,prevents workers from the operation on deck,reduces the hidden trouble.
作者 王小明 李凡 曾庆蓉 Wang Xiaoming;Li Fan;Zeng Qingrong(Changjiang Waterway Institute of Planning and Design,Hubei Wuhan 430043,China;No.1 Engineering Company Limited of CCCC Second Harbor Engineering Co.,Ltd.,Hubei Wuhan 430081,China)
出处 《港工技术》 2020年第6期92-94,共3页 Port Engineering Technology
关键词 四面六边透水框架 自动脱钩 施工工艺 four-face and six-side permeable structure automatic decoupling construction technology
  • 相关文献

参考文献11

二级参考文献30

共引文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部