期刊文献+

地下隧道施工盾构机切削穿越管桩费用分析 被引量:2

Cost Analysis on Shield Machine Cutting Pipe Piles in Tunnel Construction
下载PDF
导出
摘要 盾构施工技术在城市地下铁路隧道工程建设中应用广泛。在盾构隧道施工中,盾构穿越构筑物桩基技术难度高,风险大,费用分析困难。本文结合在建城际铁路工程,建立了对盾构切削穿越机场地下通道底部管桩的工程模型,通过合理的施工组织设计,对其工程造价进行了分析,可为今后的类似工程施组组织设计与工程费用分析提供经验参考与借鉴。 Shield machine is widely used in railway tunnel construction.It’s difficult to calculate the cost of which crossing the pile foundation due to the big construction difficulty and risks.This paper analyzes the cost of shield machine cutting through the bottom pipe pile of airport underpass based on the reasonable construction arrangement design of aintercity railway project under construction.It can provide experience and reference for the construction arrangement and cost analysis of similar shield railway tunnel construction projects in the future.
作者 尚旻 SHANG Min(China Railway Design Corporation,Institute of Engineering Economics Design,Tianjin 300308,China)
出处 《铁路工程技术与经济》 2020年第6期37-41,共5页 Railway Engineering Technology and Economy
关键词 城际铁路 盾构施工 切削管桩 盾构刀具 施工组织 工程造价 Intercity railway Shield machine Cutting pipe pile Shield cutter Construction arrangement Engineering cost
  • 相关文献

参考文献14

二级参考文献72

共引文献256

同被引文献5

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部