哈密大南湖五号井进风立井壁后注浆堵水技术应用 被引量:5

Application of grouting and water plugging technology behind wall of air intake shaft of No.5 well of Dananhu,Hami
下载PDF
导出
摘要 煤矿立井井筒长时间大量涌水,不仅降低井壁混凝土强度,而且腐蚀井筒设备,对井筒安全造成威胁。文章分析了井筒涌水量大的地质原因,制定了注浆堵水施工方案,并在现场进行了成功实施,取得了较好效果,井筒涌水量降至规范标准以下。 Once a large amount of water gushes from mine shaft for a long time,it not only reduces the strength of shaft lining concrete,but also corrodes the shaft equipment,threatening the safety of shaft.This paper analyzed the geological reasons for the large water inflow in the shaft,and formulated the construction scheme of grouting and blocking water.It has been successfully implemented in the field and achieved good results.The water inflow of the shaft is reduced to below the standard.
作者 朱光亚 ZHU Guang-ya(Hami Energy Co.,Ltd.,Xuzhou Mining BusinessGroup Co.,Ltd.,Hami,Xinjiang,839000)
出处 《煤炭科技》 2020年第6期99-101,共3页 Coal Science & Technology Magazine
关键词 进风立井 井筒 壁后 注浆 堵水 air intake shaft mineshaft groutingbehind wall water plugging
  • 相关文献

参考文献2

二级参考文献2

共引文献4

同被引文献33

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部