摘要
在长江干流江苏段崩岸应急治理工程中,抛石护岸是行之有效的治理措施之一。鉴于这一项目施工的技术性和隐蔽性,为有效提升其施工质量,强化对各过程、环节的施工质量控制极为关键。结合在南京市长江干流江苏段崩岸应急治理工程施工六标段中的实践经验,针对“抛准、抛足、抛匀”等环节分析、总结了具体的控制措施。
Riprap revetment is one of the effective measures in the emergency treatment of bank collapse in Jiangsu section of the Yangtze River.In view of the technicality and concealment of the project construction,in order to effectively improve the construction quality,it is very important to strengthen the construction quality control of each process and link.Based on the practical experience in the construction of the sixth bid section of the emergency treatment project for bank collapse in Jiangsu section of the main stream of the Yangtze River in Nanjing,the specific control measures for the links of"accurate throwing,sufficient throwing and even throwing"were analyzed and summarized.
作者
伏洲
周宏萍
曹驰宇
FU Zhou;ZHOU Hongping;CAO Chiyu(Jiangsu Hydraulic Engineering Construction Co.,Ltd.,Yangzhou 225002,China;Nanjing Water Planning and designing Institute Co.,Ltd,Nanjing 210022,China)
出处
《江苏水利》
2020年第12期61-64,共4页
Jiangsu Water Resources
关键词
长江
崩岸治理
抛石护岸
质量控制
the Yangtze River
bank collapse treatment
riprap revetment
quality control