期刊文献+

长河坝水电站大坝填筑快速施工措施研究

Study on Rapid Construction Measures for Dam Filling at Changheba Hydropower Station
下载PDF
导出
摘要 长河坝水电站大坝填筑施工过程中采用了快速施工措施,包括心墙土料质量快速检测、心墙土料分区流水施工、坝料跨心墙运输技术等措施,在满足施工质量和安全的要求下加快了施工进度,实现了参建各方共赢。介绍了长河坝水电站大坝填筑快速施工措施。 In the process of dam filling construction of Changheba Hydropower Station,rapid construction measures are adopted,including rapid detection of core wall soil material quality,partition flow construction of core wall soil material,and transportation technology of dam material across the core wall,etc.The construction progress is accelerated under the requirements of construction quality and safety,and a win-win goal is achieved for all parties involved in the construction.The rapid construction measures for dam filling at Changheba Hydropower Station are introduced.
作者 杨伟 YANG Wei(Sichuan Ertan International Engineering Consultant Co., LTD, Chengdu, Sichuan, 611130)
出处 《四川水力发电》 2020年第S02期113-117,共5页 Sichuan Hydropower
关键词 长河坝水电站 大坝 填筑 快速施工 措施 Changheba Hydropower Station dam filling rapid construction measures
  • 相关文献

参考文献4

二级参考文献7

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部