摘要
通过对兰州市某现浇钢筋混凝土框架剪力墙结构高层商住楼烂尾工程在已完成的部分主体结构基础上进行续建并改造的工程设计方案进行分析研究,浅谈其中存在的技术困难和解决方案。
Based on the analysis of the engineering design scheme of continued construction and reform for an unfinished high-rise commercial and residential building with cast-in-place reinforced concrete frame shear wall structure in Lanzhou,the existing technical difficulties and solutions are discussed.
出处
《中国建材科技》
2020年第6期151-153,共3页
China Building Materials Science & Technology
关键词
烂尾工程
续建
改造
unfinished project
continued construction
renovation