摘要
瀑布沟水电站是国家“十五”重点工程和西部大开发标志性工程,总装机容量为3600 MW,主要向成都、川西北和川南地区供电。瀑布沟机组全部投产接近9年,持续可靠的向电网供电1200多亿千瓦时,自适应重合闸在瀑布沟500 kV输出线路中的成功应用,可为其他新建同类型电厂提供参考和经验。
Pubugou Hydropower Station is a national"Tenth Five Year Plan"key project and a landmark project of western development,with a total installed capacity of 3600MW.It mainly supplies power to Chengdu,Northwest Sichuan and South Sichuan.All Pubugou generator units have been put into operation for nearly nine years and have been constantly supplying more than 120 billion kwh to the power grid.The successful application of adaptive reclosing in Pubugou 500KV output line can provide reference and experience for other similar new built power plants.
作者
孙虎强
SUN Huqiang(Dadu River Production Command Center,CHN Energy,Chengdu,Sichuan,610041)
出处
《四川水力发电》
2020年第6期108-111,共4页
Sichuan Hydropower
关键词
同杆双回线
自适应重合闸
功能
按相顺序重合
double-circuit transmission lines
adaptive reclosing
function
reclosing according to phase order