摘要
江坪河水轮发电机定子同国内外大中型水轮发电机组定子一样,选择在施工现场进行组圆、装压工作。区别在于在整个定子的安装过程中无须任何焊接,全部靠螺栓把合,定位销定位。论文主要介绍了在现场组装过程中,江坪河水轮发电机定子各项主要数据指标的控制要求及控制方法。
The stator of Jiangpinghe hydro-generator is the same as that of large and medium-sized hydro-generator sets at home and abroad. People chooses to carry on the group round, installs the pressure in the construction site the work. The difference is that there is no need for any welding in the whole stator installation process, and it is all closed by bolts and positioning pins. This paper mainly introduces the control requirements and methods of the main data indexes of the stator of Jiangping river hydrogenerator in the field assembly process.
作者
蒋国陵
JIANG Guo-ling(China Gezhouba(Group)Corporation Mechanical and Electrical Construction Co.Ltd.,Yichang 443000,China)
出处
《工程建设与设计》
2020年第24期36-37,共2页
Construction & Design for Engineering
关键词
测圆架
组圆
单鸽尾定位筋
叠片
measuring circle frame
group round
single pigeon tail locating rib
laminated