摘要 山岭隧道群施工中,拱架、锚杆、小导管、钢筋网片等钢构件用量极大。由于点多面广,地理地形条件复杂,给加工和运输安全管控带来了一定的困难。论文以济阳高速JYTJ-1标隧道群钢构件集中加工安全管控为例,浅析其安全标准化建设与管理。 In the construction of mountain tunnel group, the amount of steel components such as arch frame, anchor rod, small conduit and steel mesh is very large. Due to the wide range of points and complex geographical and topographical conditions, it is difficult to control the safety of processing and transportation. Taking the safety control of group steel components centralized processing in Jiyang highway tunnel JYTJ-1 section as an example, this paper analyzes the safety standardization construction and management.
作者 曾洁 ZENG Jie(No.3 Engineering Co.Ltd.of CCCC First Hghway Engineering Co.Ltd.,Beijing 101102,China)
出处 《工程建设与设计》 2020年第24期191-192,共2页 Construction & Design for Engineering
关键词 山岭隧道群 钢构件 集中加工 安全管控 mountain tunnel group steel components centralized processing safety control
  • 相关文献

参考文献1

二级参考文献10

共引文献6

同被引文献4

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部