期刊文献+

分层式基站自动规划补盲方法与系统

Method and system of layered base station automatic planning
下载PDF
导出
摘要 5G移动通信网络的建设优化需要运营商投入大量的资金和人力,可以充分借鉴成熟的4G规划方法、技术和经验,在有限的资源投入条件下,达到较佳的信号覆盖。分层式基站自动化规划方案可以分层并精确定位到盲点盲区等所需建立基站的位置,进一步对规划的待建基站进行优化,确保站址和站型合理且网络结构最优,有效避免资源浪费。 5G mobile communication network requires operators to invest a lot of money and manpower,it is important to carry out reasonable base station planning,which can fully draw lessons from mature 4G planning methods and experience,in order to achieve better signal coverage under limited resources.Layered base station automation planning scheme can layered and precisely locate the required base station,and further optimize the planned base station to ensure that the site and the type of station are reasonable,the network structure is optimal,and the waste of resources is effectively avoided.
作者 涂鸿渐 阮克敏 全力 吴曙辉 TU Hong-jian;RUAN Ke-min;QUAN Li;WU Shu-hui(China Mobile Group Hunan Co.,Ltd.,Changsha 410015,China)
出处 《电信工程技术与标准化》 2021年第1期59-64,共6页 Telecom Engineering Technics and Standardization
关键词 分层 覆盖 补盲 layer coverage supplementary blindpoint
  • 相关文献

参考文献3

二级参考文献14

共引文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部