摘要
以滨州至莱芜高速公路改扩建项目为例,针对施工过程中新旧路基结合处存在的差异性沉降问题,就路基路面拼接作业提出具体的施工要点及控制措施。施工实践表明:工后各项检测均满足实际要求,施工效果良好。
Taking Binzhou to Laiwu expressway reconstruction and expansion project as an example,aiming at the differential settlement problem existing in the joint of new and old subgrade in the construction process,the paper puts forward the specific construction points and control measures for the subgrade and pavement splicing operation.The construction practice shows that the inspection after construction meets the actual requirements and the construction effect is good.
作者
陈飞飞
CHEN Fei-fei(CCCC Third Highway Engineering Co.Ltd.,Beijing 100010,China)
出处
《工程建设与设计》
2021年第1期171-173,共3页
Construction & Design for Engineering
关键词
改扩建
不均匀沉降
新旧路基
路基路面拼接
reconstruction
uneven settlement
new and old roadbed
roadbed and pavement splicing