期刊文献+

某型钢轨打磨列车作业发电机室结构设计改进及试验

下载PDF
导出
摘要 某型钢轨打磨列车作业发电机冷却风扇运转造成室内负压很大,空气中的粉尘以及打磨过程中的铁屑随着气流进入室内。发电机冷却进风口吸入含金属粉尘的空气,容易造成发电机烧损等问题。本项目提出了作业发电机室结构改进方案,并通过改进试验,对改造前后的室内真空度进行了对比,证明该方案可有效降低作业发电机室内部负压,改善发电机组冷却条件;减少粉尘进入发电机室,改善发电机工作环境。 The working of the cooling fan in the working generator room of the type rail grinding train caused a serious negative pressure.the dust in the air and the iron dust produced in work enterd into the room with airflow.the cooling air inlet of the generator sucted much metallic dust air,which could lead to damage of the generator,and so on.The project made some structure transformation to the working generator room,and did same contrast tests of the vacuum in the room before and after the structure transformation,which could provide that the project could effectively reduce the negative pressure in the working generator room,and improve the generator cooling conditions,so that it could reduce the dust that into the generator room,and Improve the working environment of the generator.
出处 《科技创新与应用》 2021年第4期118-120,共3页 Technology Innovation and Application
关键词 打磨列车 发电机室 改进 试验 rail grinding train the working generator room transformation tests
  • 相关文献

参考文献7

二级参考文献19

  • 1路向阳.我国列车通信网络的发展与应用[J].机车电传动,2001(6):1-5. 被引量:31
  • 2常振臣,牛得田,王立德,田永洙.列车通信网络研究现状及展望[J].电力机车与城轨车辆,2005,28(3):5-7. 被引量:25
  • 3TB/T1335-1996铁道车辆强度设计及试验鉴定规范[S].北京:中国铁道出版社,1996.
  • 4TB/T2479.1一1993线路机械通用试验方法-整机结构和运行性能试验[S].北京:中国铁道出版社,1993.
  • 5TB/T2479.2-1993线路机械试验方法-系统性能试验[S].北京:中国铁道出版社,1993.
  • 6GB/T17426-1998铁道特种车辆和轨行机械动力学性能评定及试验方法[S].北京:中国标准出版社,1998.
  • 7田合强.钢轨打磨列车榆验报告[R].北京:铁道部产品质量监督检验中心,2010.
  • 8陈政南.GMC96型钢轨打磨列车动力学性能试验[R].北京:中国铁道科学研究院机车车辆研究所,2010.
  • 9宋惠京.TB/T 2479.1-1993.线路机械通用试验方法整机结构和运行性能试验[S].北京:中国铁道出版社,1993.
  • 10陆亦群.TB/T 2479.2-1993.线路机械试验方法系统性能试验[S].北京:中国铁道出版社,1993.

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部