太钢4号高炉扩容改造中,针对上一代炉役中冷却系统对高炉生产所造成的被动局面,吸取经验,从其设计、制造、安装、控制等方面进行改进。
Has drawn on the expeience of the passive situation caused by the cooling system during the past campaign life, improvement was made to realize the stable operation and Long Life on design, production, installation. Controlling and other aspects in technical mederizaton with capacity expansion at No. 4 BF. of Taiyuan Iron &. steel Co.
出处
《山西冶金》
CAS
2002年第1期17-18,44,共3页
Shanxi Metallurgy
关键词
高炉
炉体
冷却
改进
炼铁
blast furnace, cooling, improvement