摘要
业扩工程可根据用电客户的具体需求以及用电特征,设计出更为合理的供电方案。在传统业扩工程接入系统设计方案中,设计人员通常将供电电源点与受电点之间的距离作为整个工程设计的唯一判断指标。针对传统接入系统所存在的使用问题,电力行业工作者提出以建设费用以及建设工作作为高压业扩工程接入系统设计基本要素,并同步考量日均收益值、线路类型、线路长度等各类影响条件,最终找到更为更为优秀的接入方案优化设计方式。本文将会针对业扩工程接入系统方案优化设计的相关研究进行初步分析与探讨,希望借此可对相关从业人员起到一定借鉴价值。
According to the specific needs and characteristics of power customers,a more reasonable power supply scheme can be designed.In the design scheme of the traditional industrial expansion project access system,the designer usually takes the distance between the power supply point and the receiving point as the only judgment index of the whole engineering design.In view of the problems existing in the traditional access system,the electric power industry workers put forward that the construction cost and construction work should be taken as the basic elements of the design of the high voltage expansion project access system.In this paper,the author will carry on the preliminary analysis and the discussion to the related research which the industry expansion project access system scheme optimization design,hoped that this may play the certain reference value to the related practitioners.
出处
《电力系统装备》
2020年第23期157-158,共2页
Electric Power System Equipment
关键词
供电方案
接入系统
业扩工程
电网建设周期
电网优化设计
power supply scheme
access system
industrial expansion project
power grid construction cycle
power grid optimization design