摘要
介绍某混凝土重力坝水平位移采用引张线结合垂线的监测方法,根据大坝结构、水位、温度进行大坝水平位移综合分析。某混凝土重力坝水平位移与坝体结构、坝上下游水位、坝体温度有较强的相关性,主要表现为坝上水位升高时坝体向下游位移,坝上水位降低时坝体向上游位移,坝体温度降低时大坝收缩,坝体温度升高时大坝膨胀。
The monitoring method of horizontal displacement of a concrete gravity dam is introduced.According to the dam structure,water level and temperature,the horizontal displacement of the dam is comprehensively analyzed.The horizontal displacement of a concrete gravity dam has a strong correlation with the dam structure,upstream and downstream water level and dam body temperature.The main performance is that the dam moves downstream when the upstream water level rises,the dam moves upstream when the upstream water level decreases,the dam shrinks when the dam temperature decreases,and the dam expands when the dam temperature rises.
作者
唐勇
杨维新
曹晓月
TANG Yong;YANG Wei-xin;CAO Xiao-yue(Sinohydro Bureau 14 co.,Ltd.,Kunming 650041,China;Yangtze University,Laboratory of Oil and Gas Resources and Exploration Technology,Wuhan 430000,China)
出处
《云南水力发电》
2021年第1期59-64,共6页
Yunnan Water Power
关键词
混凝土重力坝
水平位移
综合分析
坝体温度
concrete gravity dam
horizontal displacement
comprehensive analysis
dam temperature