摘要 基于已有的勘探和开挖揭露成果,对金安桥水电站扩机项目地下洞室群的主要工程地质问题进行了分析评价。高地应力、凝灰岩软弱夹层以及断层破碎带是影响地下洞室群围岩稳定的主要问题。下一步的工作中应对其进行重点研究,以指导施工建设。 Based on the existing exploration and excavation results,this paper analyzed and evaluated main engineering geological problems of underground cavern group of the expansion project of Jin'anqiao Hydropower Station.High ground stress,weak interlayer of tuff and fault fracture zones are the main problems affecting the stability of the surrounding rocks in underground caverns group.The next work should focus on it to guide construction.
作者 崔小东 王小锋 CUI Xiao-dong;WANG Xiao-feng(Power China Kunming Engineering Corporation Limited,Kunming 650051,China)
出处 《云南水力发电》 2021年第1期79-84,共6页 Yunnan Water Power
关键词 主要工程地质问题 高地应力 凝灰岩软弱夹层 断层破碎带 main engineering geological problems high ground stress tuff interlayer fault fracture zone
  • 相关文献

参考文献9

二级参考文献26

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部