期刊文献+

起重船近海风电场坐底施工作业分析 被引量:1

Operation analysis on the on-bottom construction by a crane vessel in a nearshore wind farm
下载PDF
导出
摘要 以起重船“三航工5”为例,结合某海上风场环境条件,对不具有坐底相关入级符号的起重船坐底施工作业及坐底全过程所涉及的技术问题进行分析,并对锚固定位和坐底稳性进行计算,采用经验公式计算波流荷载、频域边界元方法计算波浪力。计算结果表明,“三航工5”在淤泥底质条件下,需要在流速小于1.3 m/s的条件下进行下潜或上浮作业,以避免走锚;为满足坐底稳性要求,需要初始超加压载水达到4500 t,后降至2500 t。 Taking the crane vessel Sanhang Gong 5 as an example,combined with the environmental conditions of a certain nearshore wind farm,the technical problems involved in the construction and the whole process of the on-bottom setting of the crane vessel without relevant classification symbols were analyzed.The anchoring positioning and on-bottom stability were calculated.The wave current load was calculated by empirical formula and the wave force was calculated by using the frequency domain boundary element method.The calculation results show that under the condition of silt bottom material,the Sanhang Gong 5 needs to dive or float under the condition of velocity of flow less than 1.3 m/s to avoid anchor moving,in order to satisfy the on-bottom stability requirements,the initial amount of ballast water extra should be 4500 t,and then reduced to 2500 t.
作者 杜宇 王菁 谢锦波 王晨旭 DU Yu;WANG Jing;XIE Jin-bo;WANG Chen-xu(CCCC Third Harbor Engineering Co.,Ltd.,Shanghai 200032,China;Tianjin University,Tianjin 300072,China)
出处 《中国港湾建设》 2021年第1期48-51,共4页 China Harbour Engineering
关键词 坐底船 起重船 坐底稳性 半潜稳性 锚固定位 on-bottom vessel crane vessel on-bottom stability semi-submersible stability anchoring positioning
  • 相关文献

参考文献2

二级参考文献10

共引文献3

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部