2Koskela L. An Exploration towards a Production Theory and Its Application to Construction : Ph. D., University of Technology[D]. Finland: University of Technology, 2000.
3Liu M, Ballard G. Factors affecting work flow reliability: A case study[C]. In: Proc of Conf of 1GLC-17. Taipei- Taiwan, 2009.
4江志斌.Petri网及其在制造系统建模与控制中的应用[M]北京:机械工业出版社,2004.
5袁崇义.Petri网原理[M]北京:电子工业出版社,1998.
6成虎.工程项目管理[M]北京:中国建筑工业出版社,1997.
7Bajaj A,S Ram. SEAM:A state-entity-activity-model for a well-defined workflow development methodology[J].IEEE Transactions on Knowledge and Data Engineering,2002,(03):139-140.
8Hollingsworth D. Workflow Management Coalition:The Workflow Reference Model[M].Brussels:WfMC-TC-1003,1994.