期刊文献+

华龙一号应急工况评价系统初步开发

The preliminary development of emergency condition assessment system for HPR1000
下载PDF
导出
摘要 为了满足华龙一号(HPR1000)事故条件下的应急响应,需要开发一套应急工况评价系统,用于基于征兆的堆芯损伤评价和释放源项估算。本文给出了华龙一号应急工况评价系统(ECAS-HPR1000)的总体设计,包括软件框架、评价模块、平台和接口开发等,该系统采用跨平台的JAVA语言开发,以MySQL数据库作为数据存储,支持Windows和Linux操作系统。该系统包括五个子系统,分别是基础数据采集和管理子系统、堆芯损伤评价子系统、释放源项计算子系统、评价结果展示子系统和用户权限管理子系统。该系统可以基于实时工况数据,评价堆芯损伤状态和程度,并计算出堆芯释放到一回路、安全壳和环境的放射性核素的量,并考虑了华龙一号双层安全壳对计算结果的影响。 For meeting with the requirements of preparedness and response in case of a nuclear emergency of HPR1000,a system used to assess the core damage status and to estimate the source term released to the environment must be developed.The development of Emergency Condition Assessment System for HPR1000(ECAS-HPR1000)was introduced,including its software framework,assessment modules,platform and data interfaces,etc.The system adopts the JAVA language as the platform,and open source MySQL as the data management system,supporting Windows and Linux OS.There are five subsystems,including 1)basic data acquisition subsystem,real-time acquiring the reactor operation parameters from Distributed Control System(DCS),2)core damage assessment subsystem,which used to assess the core damage status and degree,3)source term estimation subsystem,calculating the amount of radioactive material released from the core into the primary coolant system,containment and environment,4)assessment results display subsystem,5)user authorization management subsystem.
作者 杨亚鹏 冯宗洋 贾林胜 王宁 王任泽 梁博宁 刘一宁 YANG Yapeng;FENG Zongyang;JIA Linsheng;WANG Ning;WANG Renze;LIU Yining(China Institute for Radiation Protection,Taiyuan 030006)
出处 《辐射防护》 CAS CSCD 北大核心 2020年第6期647-651,共5页 Radiation Protection
关键词 堆芯损伤评价 释放源项计算 核应急 core damage assessment source term estimate nuclear emergency
  • 相关文献

参考文献1

二级参考文献5

  • 1IAEA.Generic assessment procedures for determining protective actions during a reactor accident. IAEA-TECDOC-955 . 1997
  • 2FAO,IAEA,ILO,PAHO,WHO.Criteria for use in preparedness and response for a nuclear or radiological emergency. General safety guide No.GSG-2 . 2011
  • 3Westing House Electric Company LLC.Westing House owners group core damage assessment guidance. WCAP-14696-A (Revision1) . 1999
  • 4Ramsdell JV,etc.RASCAL 4:Description of models and methods. NUREG- 1940 . 2010
  • 5Methodology for development of emergency action levels. NEI 99-01.Rev.5 . 2008

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部