摘要
本文根据四川省"中央广播电视节目无线数字化覆盖工程"建设施工组织实施全过程管理的工作实践,分析总结了该项目组织实施过种中存在的一些管理问题及采取的策略应用相关情况。
According to work practice on the whole process management of organizing and implementing and construction of"Wireless Digitalization Coverage Project of Central Radio and Television Program"in Sichuan,this paper analyzes and summarizes some management problems existing in the implementation of this project and related application of adopted strategies.
作者
梁哲钧
Liang Zhejun(Panzhihua Radio and Television,Sichuan 617000,China)
出处
《广播与电视技术》
2020年第11期129-131,共3页
Radio & TV Broadcast Engineering
关键词
广播电视
发射台站
设备安装
组织实施
Radio and television
Transmitting stati
Equipment Installation
Organization and implementation