摘要
以广州西朗全地埋污水处理厂工程为例,通过BIM技术在施工过程中的具体应用进行了探索。提出了BIM技术在临建规划、地质边坡分析、模型创建优化、指导现场施工、BIM+新技术应用等方面的实施措施,为BIM技术在污水处理厂施工中的应用提供借鉴。
Taking Guangzhou Xilang fully buried sewage treatment plant project as an example,this paper explores the specific application of BIM technology in the construction process.It puts forward the implementation measures of BIM technology in overlay planning,geological slope analysis,model creation optimization,site construction guidance,BIM+new technology application.It provides reference for the application of BIM technology in the construction of sewage treatment plant.
作者
程江
王斌
张腾
CHENG Jiang;WANG Bin;ZHANG Teng(China Railway First Bureau Municipal Environmental Protection Engineering Co.,Ltd,Lanzhou 730050,China)
出处
《广东水利水电》
2021年第1期78-82,共5页
Guangdong Water Resources and Hydropower
关键词
BIM技术
地埋式
污水处理厂
应用
BIM technology
buried
sewage treatment plant
application