期刊文献+

南四湖大桥岩溶区桩基施工全护筒跟进处理技术 被引量:1

Study on the follow-up treatment technology of pile foundation construction in karst area of Nansihu bridge
下载PDF
导出
摘要 枣菏高速南四湖特大桥桩基施工场地岩溶发育,溶洞大小不一,为半填充或全填充,在处理溶洞过程中,出现卡钻、掉钻现象,给施工造成难度。在工程实际建设中,采用全护筒跟进技术处理不同岩溶溶洞,提高桩基施工质量。 The construction site of the pile foundation of Nansihu super large bridge of Zaohe high speed has developed karst,and the size of the karst cave is different,which is half filled or full filled.In the process of dealing with the karst cave,the phenomenon of sticking and falling out of the borehole occurs,which makes the construction difficult.In the actual construction of the project,the full casing follow-up technology is used to deal with different karst caves,improve the quality of pile foundation construction.
作者 张迎春 侯亚辉 王培森 张光桥 苏小杰 ZHANG Yingchun;HOU Yahui;WANG Peisen;ZHANG Guangqiao;SU Xiaojie(Shandong Luqiao Group Co.,Ltd.,Shandong Jinan 250021 China;Shandong Road&Bridge Construction Co.,Ltd.,Shandong Jinan 250021 China;Shandong Jianzhu University,Shandong Jinan 250101 China;Shandong Zhongkan Engineering Technology Co.,Ltd.,Shandong Jinan 250014 China)
出处 《山东交通科技》 2020年第6期83-84,103,共3页
关键词 南四湖大桥 岩溶区 桩基施工 全护筒跟进技术 Nansihu bridge karst area pile foundation construction full casing follow-up technology
  • 相关文献

参考文献3

二级参考文献4

共引文献11

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部