10LI Jianjun, SHAO Shengjun, YANG Chunming, et al. Key technology of constructing the cut-off wall under the foundation with large depth soils layer in Tibet: Zhikong hydropower station [ J]. Electric Technology and Civil Engineer, 2011, (22-24) : 2340-2344.