提高现浇0#块纵向预应力波纹管安装定位精准度

Improving the Accuracy of Installation and Positioning of Cast-in-place 0#Block Longitudinal Prestressed Corrugated Pipe
下载PDF
导出
摘要 本项目采用预制节段梁悬臂拼装施工工艺,现浇0#块纵向预应力波纹管安装定位精准度是施工中的一个关键环节,若其出现误差,将会影响后续节段梁拼装精准度。本文通过小组活动分析,总结了现浇0#块纵向预应力波纹管安装定位精准度的工艺技术,以培养专业型技术人才,在减少成本、提高效益等方面提供参考价值。 This project adopts the cantilever assembly technology of precast segment beams.The installation and positioning accuracy of the cast-in-place 0#block longitudinal prestressed corrugated pipe is a key link in the construction.If there is any error,it will affect the accuracy of subsequent segment beam assembly.Through the analysis on the group activities,this paper summarizes the technology of the installation and positioning accuracy of the vertical prestressed corrugated pipe of 0#block,cultivates professional technical personnel,and provides reference value in reducing costs and improving benefits.
作者 武玉凤 Wu Yufeng(Sinohydro Bureau 11 Co.,Ltd.,Zhengzhou Henan 450001,China)
出处 《城市建筑》 2020年第33期127-129,共3页 Urbanism and Architecture
关键词 0#块纵向预应力波纹管 安装定位 精准度 合格率 对策实施 0#block longitudinal prestressed corrugated pipe installation positioning accuracy pass rate countermeasure implementation
  • 相关文献

参考文献5

二级参考文献14

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部