喻家河水库大坝基础处理施工方法

Construction Technology in Foundation Treatment of Yujiahe Reservoir Dam
下载PDF
导出
摘要 喻家河水库工程左岸坝段地基主要为大隆组泥灰岩夹页岩,层间结合较差,结构面较发育,不利于坝基稳定。针对该地基的复杂情况,设计施工采取了深层固结灌浆,分段、注浓浆、加大灌浆压力、待凝、反复扫孔注浆等工艺;帷幕灌浆采用现场工艺试验,分部位采用不同灌浆结束标准等。结束后经现场质量检查和蓄水验证,固结灌浆、帷幕灌浆工艺选择合适,灌浆质量可靠。 The foundation of the left bank dam section of Yujiahe Reservoir Project is mainly composed of marl and shale of Dalong formation with weak interlayer bonding and developed structural planes,which is adverse to the dam foundation stability.Considering the complex conditions of the foundation,deep consolidation grouting and curtain grouting are implemented.In the consolidation grouting,construction technology such as segmented grouting,thick grouting slurry,increased grouting pressure,solidification waiting,and repeated hole cleaning and grouting is adopted.In the curtain grouting,in-situ tests and different grouting completion standards are adopted for different locations.After the construction,in-situ quality inspection and water storage verification show that the consolidation grouting and the curtain grouting are of reliable quality with appropriate construction technology.
作者 刘安宇 杨仕志 LIU Anyu;YANG Shizhi(Hubei Dayu Construction Co., Ltd., Wuhan 430070, China;Hubei Institute of Water Resources Survey and Design, Wuhan 430071, China)
出处 《水电与新能源》 2021年第1期75-78,共4页 Hydropower and New Energy
关键词 大坝基础 基础处理 深层固结灌浆 帷幕灌浆 dam foundation foundation treatment deep consolidation grouting curtain grouting
  • 相关文献

参考文献2

二级参考文献11

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部