摘要
采用理论推导和实验验证计算了窑头大缩口回转窑运转所需功率、物料的停留时间和填充系数,确定了回转窑电机功率。与原回转窑相比,新回转窑在转速提高、投料量增加的情况下,电机选用功率大幅降低,节能降耗效果显著。
The oretical derivation and experimental verification are utilized to calculate the power required for the operation of the rotary kiln with large shrinkage mouth at the kiln head,the residence time of materials and the filling coefficient,and the motor power of the rotary kiln is determined.Compared with the original rotary kiln,the new rotary kiln has a significant reduction in motor power selection and remarkable energy saving and consumption reduction effect under the condition of increasing rotating speed and feeding amount.
作者
柴玉川
高鹏
崔丽霞
CHAI Yuchuan;GAO Peng;CUI Lixia(Henan Longbai Intelligent Equipment Manufacturing Co.,Ltd.,Jiaozuo Henan 454000,China)
出处
《水泥技术》
2021年第1期24-27,共4页
Cement Technology
关键词
窑头大缩口回转窑
功率计算
滚动轴承
kiln head large necking rotary kiln
power calculation
rolling bearing