期刊文献+

一停产大型煤矿恢复生产可行性方案简析

Brief Analysis of Feasibility Plan for Resuming Production in Large Discontinued Coal Mine
下载PDF
导出
摘要 自2013年,在中国经济新常态,国家钢铁、煤炭产能大幅过剩的环境之下,大量厂矿企业出现巨额亏损,主动或被动实施了停产、破产。一些矿井在突如其来的市场变化中选择停产,但停产后长期巨额的维护费用,以及市场需求的波动变化,都对煤矿企业如何决策煤矿下一步走向产生着影响。结合清水营煤矿停产、小范围恢复生产和大范围恢复生产3种方案之间的投入、成本、效益之间的对比,推荐了符合该煤矿业主利益的方案。该分析方法及思路可为其他停产煤矿分析决策提供参考,也可为准备投资煤炭行业的业主预测投资后风险提供参考。 Since 2013,in the new normal of China's economy,the country's large overcapacity in steel and coal production environment,a large number of factories and mining enterprises appear huge losses,active or passive implementation of the shutdown,bankruptcy.Some mines choose to stop production in the sudden market changes,but the long-term huge maintenance costs after the stop production,as well as the fluctuation of market demand,all have an impact on how the coal mine enterprise to make the next step.Based on the comparison of input,cost and benefit among three schemes of stopping production,resuming production in a small scope and resuming production in a large scale in Qingshuiying Coal Mine,this paper recommended the scheme which was in line with the interests of the mine owner.The analysis method and train of thought in this paper can provide reference for analysis and decision-making of other discontinued coal mines,and also can provide reference for the owners who plan to invest in coal industry to predict the post-investment risk.
作者 刘光金 LIU Guangjin(Ningxia Coal Mine Design and Research Institute Co.,Ltd.,Yinchuan 750011,Ningxia,China)
出处 《能源与节能》 2021年第1期30-32,65,共4页 Energy and Energy Conservation
关键词 煤矿 恢复生产 可行性方案 coal mine resuming production feasibility plan
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部