白鹤滩水电站输水发电系统水工模型试验研究 被引量:9

Experimental Study on Water Conveyance System of Baihetan Hydropower Station
下载PDF
导出
摘要 白鹤滩水电站单机容量目前居世界之首,输水发电系统规模巨大,尾水隧洞存在明满流现象,尾水调压室存在上室明流,水力学条件复杂,有必要深入研究输水系统水力学问题。采用整体模型试验方法,研究尾水隧洞出口结构布置形式的影响和输水系统整体布置的合理性。结果表明,尾水隧洞出口设置逆坡堰,可明显改善尾水隧洞明满流流态,减小尾水连接管进口负压,抬高尾水调压室最低涌浪水位,水力学条件更优。大波动工况下,输水系统各部位压力和涌浪极值满足设计要求,输水系统布置合理。研究结果可为白鹤滩工程设计提供技术支撑,也可为类似工程提供借鉴。 The single unit capacity of Baihetan Hydropower Station currently is the world's largest.The water convey-ance system is huge and the hydraulic conditions are complicated.The tailrace tunnel has free-surface-pressurized flow and the upper surge chamber has open channel flow.It is necessary to conduct further study on the hydraulic problems.In this paper,experiment method was adopted to research the influence of the tailrace tunnel outlet structure layout and the rationality of the overall layout of water conveyance system.The results show that the adversary slope weir at the outlet of tailrace tunnel can significantly improve the free-surface-pressurized flow regime,reduce the negative pressure at the inlet of tailrace connecting pipe,raise the lowest surge level of tailrace surge chamber,and have better hydraulic condi-tions.In large fluctuation operating conditions,the extreme pressure and surge water level in different parts of the water conveyance system meets the design requirements,and the layout of the whole water conveyance system is reasonable.The research results can provide technical support for Baihetan project design,and can also provide reference for similar projects.
作者 孙洪亮 陈益民 蔡付林 杨飞 李高会 陈祥荣 SUN Hong-liang;CHEN Yi-min;CAI Fu-lin;YANG Fei;LI Gao-hui;CHEN Xiang-rong(PowerChina Huadong Engineering Corporation Limited,Hangzhou 311122,China;College of Water Conservancy and Hyd ropower Engineering,Hohai University,Nanjing 210098,China)
出处 《水电能源科学》 北大核心 2021年第2期90-92,89,共4页 Water Resources and Power
关键词 白鹤滩 百万千瓦机组 输水系统 明满流 模型试验 Baihetan 1000 MW unit water conveyance system free-surface-pressurized flow model experiment
  • 相关文献

参考文献4

二级参考文献8

  • 1王树人,东北水利发电学报,1986年,1期,19页
  • 2左东启,模型试验的理论和方法,1984年
  • 3Cunge J A, Wenger M. Integration Numerique des Equations d' ecoulement de Barre de Saint-Venant Par Un Schema Implicite de Differences Finies.. Ap- plication au cas d' une Galerie Tantot a Surface Li- bre[J]. La Houille Blanche, 1964 (1) : 33-99.
  • 4Garcia-Navarro P, Alcrudo F, Priestley A. An Im- plicit Method for Water Flow Modelling in Channels and Pipes[J]. Journal of Hydraulic Research,1994, 32(5) :721-742.
  • 5Wylie E B, Streeter V L, Suo Lisheng. Fluid Tran- sient in Systems [M]. New Jersey: PRENTICE HALL, Englewood Cliffs, 1993.
  • 6张健,俞晓东,朱永忠.长距离供水工程的关阀水锤与线路充填[J].水力发电学报,2010,29(2):183-189. 被引量:26
  • 7樊红刚,陈乃祥,刘立宪,李辉.明满混合瞬变流动仿真计算分析[J].清华大学学报(自然科学版),2000,40(11):63-66. 被引量:17
  • 8胡明,蔡付林,曹青.矩形调压室连接型式的研究[J].河海大学学报(自然科学版),2000,28(2):92-95. 被引量:7

共引文献15

同被引文献80

引证文献9

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部