摘要
以绿地山东国际金融中心项目为案例,针对其混凝土组合钢板剪力墙结构体系的施工难点,从钢结构深化、构件加工、物流运输、安装焊接等方面出发,对钢板剪力墙的关键施工工艺进行了总结。项目实施效果较好,证明所述工艺措施具有一定的推广和应用价值。
Taking the Greenland Shandong International Financial Center project as a case study,the key construction technology of the steel plate shear wall is summarized for the construction difficulties of the concrete composite steel plate shear wall structure system,from the aspects of steel structure deepening,component processing,logistics and transportation,installation and welding.The project has a good implementation effect,which proves that the said process measures have certain promotion and application value.
作者
董传艺
郭强
王帅
李凤堂
DONG Chuanyi;GUO Qiang;WANG Shuai;LI Fengtang(The Second Construction Limited Company of China Construction Eighth Engineering Division,Jinan,Shandong 250022,China)
出处
《建筑施工》
2021年第1期37-39,共3页
Building Construction
关键词
超高层建筑
核心筒
组合钢板剪力墙
钢结构焊接
super high-rise building
core tube
composite steel plate shear wall
steel structure welding