摘要
在公路桥梁工程施工中,传统的桥梁墩柱现浇施工技术已经落伍,其中存在大量的问题,不仅延长了工程的施工工期,也降低了工程施工的质量,并带来了大量的工程隐患。而装配式桥梁墩柱预制技术的应用,则彻底改变了这一现状,极大地缩短了施工工期,提升了工程施工质量。
In the construction of highway bridge engineering,the traditional cast-in-place construction technology of bridge piers has fallen out of date.There are a lot of problems in it,which not only prolongs the construction period of the project,but also reduces the quality of the construction,and brings a lot of hidden dangers.The application of prefabricated bridge pier column technology has completely changed this status quo,greatly shortened the construction period and improved the construction quality of the project.
作者
李鹏飞
LI Peng-fei(CCCC-SHEC Third Highway Engineering Co.,Ltd.,Xi'an 710016,China)
出处
《价值工程》
2020年第36期151-152,共2页
Value Engineering
关键词
公路桥梁
装配式桥梁
墩柱
预制施工
highway bridge
fabricated bridge
pier column
precast construction