摘要
当前,油田开采已经进入后期阶段,老转油站开采工艺老化情况时有存在,且大部分设备应用周期已经达到限期,所以转油站新建已经成为常见显现,但是相对于传统转油站来说,新转油站工艺流程不断改进和优化,自动化控制能力不断加强,但是其在应急系统、维修体系及生产流程过程中依然存在一些问题,所以本文就转油站工艺流程中存在的问题进行分析,并采取了针对性措施进行解决。
At present,oilfield exploitation has entered the later stage.The aging of the old oil transfer station mining technology sometimes exists,and most of the.However maintenance system and production process.Therefore,this article focuses on the problems in the process flow of the oil transfer station.Carry out analysis,and take targeted measures to solve.
作者
李必怡
LI Bi-yi(Daqing Oilfield Design Institute Co.,Ltd.Daqing 163000,China)
出处
《全面腐蚀控制》
2021年第1期42-43,共2页
Total Corrosion Control
关键词
转油站
工艺流程
问题分析
对策
transfer station
technological process
problem analysis
countermeasure