期刊文献+

某输水隧洞穿越白垩系泥岩段两种不同开挖方法对比分析 被引量:1

Comparative analysis of two excavation methods for a water delivery tunnel section through Cretaceous system mudstone
下载PDF
导出
摘要 某无压输水隧洞穿越一段白垩系泥岩段地层,极软岩,Ⅴ类围岩,采用数值模拟手段,对本围岩段静力状态下岩体在全断面开挖和上下台阶法开挖两种工况下,隧洞的围岩变形特性和支护结构受力进行分析研究,从而提出更为合理的开挖方法。 A free-flow water delivery tunnel section is accommodated in extremely soft V-class surrounding rock of Cretaceous system mudstone.Numerical simulation analysis was conducted to study the surrounding rock deforma⁃tion characteristics and force of supporting structure when rock mass in static state is excavated by full-section ex⁃cavation method or upper and lower bench excavation method,based on which more rational excavation method is proposed.
作者 秦国强 QIN Guo-qiang(Xinjiang Survey and Design Institute for Water Resources and Hydropower,Urumqi 830000,China)
出处 《广西水利水电》 2021年第1期68-72,80,共6页 Guangxi Water Resources & Hydropower Engineering
关键词 输水隧洞 白垩系 极软岩 全断面开挖法 上下台阶开挖法 数值模型 Water delivery tunnel Cretaceous system extremely soft rock full-section excavation method upper and lower bench excavation method numerical model
  • 相关文献

参考文献16

二级参考文献132

共引文献190

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部