摘要 分析了某水电厂一起保护传动试验期间导叶未全关投锁定事件的原因,并提出了处理意见和控制措施,以便提前采取有效的安全措施,确保检修试验工作的顺利开展,减少不必要的经济损失、杜绝人身伤害事故的发生。 Analysis was made on the causes for an error-locking fault under wicket gates not completely closed in the course of protection drive test at a hydropower plant,based on which treatment proposal and control measures were put forward to take effective safe measures in advance,ensure smooth going of maintenance test,reduce unnec⁃essary economic lost and prevent personal injury.
作者 卢亚萌 LU Ya-meng(Hydropower Plant of Tianshengqiao 1st-stage Hydropower Development Co.,Ltd.,Xingyi 562400,China)
出处 《广西水利水电》 2021年第1期89-91,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 发变组保护 传动试验 导叶接力器 锁定装置 Generator-transformer protection drive test wicket gate servomotor locking device
  • 相关文献

参考文献3

二级参考文献2

  • 1哈尔滨电机有限责任公司.(SF300-44/12440)天生桥一级水电站水轮发电机设计技术说明书[S].哈尔滨:哈尔滨电机有限责任公司,1998.
  • 2机械工程师手册编辑委员会.机械工程师手册[S].北京:机械工业出版社,1998.

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部