摘要
高速铁路项目工地试验室、混凝土拌合站信息化管理体系,需从高速铁路施工项目原材料源质量开始把关,实现试验检测和基础数据采集全过程的信息化管理,以数据为基础即时对现场生产和质量进行直接有效管控。文章以新建张家界—吉首—怀化高速铁路站前工程施工总价承包招标ZJHZQ-6标项目为背景,对高速铁路项目工地试验室、拌合站信息化管理体系及应用进行系统阐述。
Information management system of high-speed railway project field-site lab and concrete mixing plant needs to start from the quality of raw materials source of highspeed railway construction project,realize the whole process information management of test and inspection and basic data collection,and realize the direct and effective control of on-site production and quality based on data.Based on the Lot ZJHZQ-6 project of Zhangjiajie-Jishou-Huaihua high-speed railway civil engineering construction tendering and contract stage,this paper systematically expounds the information management system and application of highspeed railway project field-site laboratory and mixing plant.
出处
《现代城市轨道交通》
2021年第2期66-69,共4页
Modern Urban Transit
关键词
高速铁路
工地试验室
拌合站
信息化管理
high-speed railway
field-site lab
mixing plant
information management