摘要 随着社会经济的发展,在城市近滩涂处进行填海造地施工的需求逐渐增多。近滩涂处常年受水力作用影响,多为淤泥淤积地带,同时紧邻城市生活区,对填海造地的施工工艺的选择要求较高。以马来西亚新山丽都林荫大道吹填造地项目为载体,以皮带式吹砂船为主要施工设备,研究类似工程的施工工艺,从采用高精度雷达来准确测定船舶装舱量、优化现场施工部署以减少流失量等措施入手,总结工程施工经验。 With the development of social economy,the demand for land reclamation construction near the tidal flats is increasing gradually.Affected by water power all the year round,the near-tidal flat is mostly silted and adjacent to urban living areas,which requires higher selection of construction technology for reclamation.Based on the land reclamation project of Lido Boulevard in Xinshan,Malaysia,and with the belt-type sand blower as the main construction equipment,the construction technology of similar projects was studied.The engineering construction experience was summarized starts with the measures such as using high-precision radar to accurately measure the vessel loading capacity and optimizing the site construction deployment to reduce the loss volume.
作者 莫建波 赵彪 柳夏宸 MO Jian-bo;ZHAO Biao;LIU Xia-chen(Shanghai Communications Construction General Contracting Co.,Ltd.,Shanghai 200136,China;Zhonggang Dredging Co.,Ltd.,Shanghai 200136,China)
出处 《中国港湾建设》 2021年第2期67-70,共4页 China Harbour Engineering
关键词 皮带式吹砂船 淤泥淤积地带 船舶量方 belt-type sand blower silty zone measure the vessel loading capacity
  • 相关文献

参考文献8

二级参考文献33

共引文献44

同被引文献10

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部