摘要 贵阳轨道交通L2工程地处典型的喀斯特地貌类型区域,地质构造比较发育,常规的勘探方法对勘探点之间的溶洞、破碎带等的探测存在一定局限性。因此,采用跨孔电阻率CT法和钻孔相互验证的方式,基本查明贵阳轨道交通L2油榨街站—贵钢站区间下穿市南路、宝山南路高架的地质条件,为设计和施工提供更为翔实的地质勘察资料。 Guiyang Rail Transit L2 project is located in a typical karst landform type area,where the geological structure is relatively developed.The conventional exploration methods have some limitations in the detection of karst caves&fracture zones between exploration points.Therefore,the geological conditions of the section of Youzhajie Station-Guigang Station of Guiyang Rail Transit L2 under Shinan Rd.&South Baoshan Rd.Viaduct are basically found out by using cross-hole resistivity CT method&borehole mutual verification;which may provide more detailed geological survey data for design&construction.
作者 丁贺权 DING He-quan(Shanghai Civil Defense Foundation Investigation Institute Co.,Ltd.,Shanghai 200237,China)
出处 《中国市政工程》 2021年第1期49-51,87,88,共5页 China Municipal Engineering
关键词 跨孔电阻率CT法 贵阳轨道交通 岩溶 cross-hole resistivity CT method Guiyang Rail Transit karst
  • 相关文献

参考文献5

二级参考文献43

共引文献61

同被引文献50

引证文献5

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部