期刊文献+

组合型加筋土挡墙在抽水蓄能电站上下库连接道路中的应用 被引量:2

Application of Combined Reinforced Earth Retaining Wall in the Connection Road of Upper and Lower Reservoirs of Pumped-storage Power Station
下载PDF
导出
摘要 深圳抽水蓄能电站上下库连接道路深谷冲沟路段采用组合型加筋土挡墙结构,减少了植被破坏和水土流失,建成至今已安全运行8年,未出现结构变形失稳。介绍了组合型加筋土挡墙的方案比选、结构形式、施工工序和质量控制措施,为今后类似项目施工建设积累了宝贵的工程经验。 The combined reinforced earth retaining wall structure is adopted in the deep valley gully section of the connection road between the upper and lower reservoirs of Shenzhen Pumped-storage Power Station,which can reduce vegetation damage and soil erosion.Up to now,it has been operated safely for 8 years without structural deformation and instability.The scheme comparison,structural form,construction process and quality control measures of combined reinforced earth retaining wall are introduced herein,which has accumulated valuable engineering experiences for similar projects in the future.
作者 龙方 闵元科 林荣 胡勇健 刘权 蔡维鑫 LONG Fang;MIN Yuanke;LIN Rong;HU Yongjian;LIU Quan;CAI Weixin(Shenzhen Pumped Storage Power Co.,Ltd.,Shenzhen 518115,Guangdong,China)
出处 《水力发电》 2021年第2期41-43,96,共4页 Water Power
关键词 组合型加筋土挡墙 预制组合块 土工格栅 环境保护 质量控制 深圳抽水蓄能电站 combined reinforced earth retaining wall prefabricated composite block geogrid environmental protection quality control Shenzhen Pumped-storage Power Station
  • 相关文献

参考文献3

二级参考文献2

共引文献47

同被引文献14

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部