期刊文献+

深圳抽水蓄能电站项目档案规范化管理创新 被引量:2

Innovation in Standardized Management of Project Achieves of Shenzhen Pumped-Storage Power Station
下载PDF
导出
摘要 工程项目建设档案收集具有涉及面广、周期长、难度大等特点。为此,针对不同情况项目档案的管理特点,把管理触角渗透到工程建设的全过程。把档案编制与项目合同支付挂钩,以档案工作考核、信息化管理流程促进档案工作规范化和管理创新,不断完善和规范项目档案管理工作。把竣工档案的编制工作与工程建设的“三同步”作为档案专项验收的目标,真正实现建设项目档案工作与工程建设同步布置、同步检查和同步验收。 The collection of construction archives of engineering projects has the characteristics of wide coverage,long period and great difficulty.For this reason,according to the management characteristics of project archives in different situations,the management tentacles are penetrated into the whole process of project construction.By linking the compilation of archives with the payment of project contracts,and promoting the standardization and management innovation of archives work through the assessment of archives work and information management process,the project archives management is continuously improved and standardized.Taking the compilation of completion files and the“Three synchronizations”of engineering construction as the goal of special archives inspection and acceptance,the synchronization of the arrangement,inspection and acceptance of construction project archives and engineering construction is truly realized.
作者 周佩玉 唐川 李毅 顾志坚 黄华 王洪彪 ZHOU Peiyu;TANG Chuan;LI Yi;GU Zhijian;HUANG Hua;WANG Hongbiao(Shenzhen Pumped Storage Power Co.,Ltd.,Shenzhen 518115,Guangdong,China)
出处 《水力发电》 2021年第2期74-80,共7页 Water Power
关键词 档案规范化 管理创新 深圳抽水蓄能电站 archive standardization management innovation Shenzhen Pumped-storage Power Station
  • 相关文献

同被引文献10

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部