盐通铁路EPC总承包模式管理分析与总结 被引量:6

Management analysis and summary of EPC mode of Yancheng-Nantong railway
下载PDF
导出
摘要 结合盐通铁路EPC总承包项目管理实例,阐述了设计院作为EPC总承包单位的优势,包括设计的龙头优势,设计与施工的深度融合,设计技术创新等。同时分析总包项目管理过程中存在的问题及原因,并提出了相关改进建议,包括转变角色合作共赢、优化设计提升品质、培养人才健全机制,可为其他铁路EPC总承包项目提供参考与借鉴。 Taking EPC management practice of Yancheng-Nantong railway as an example,this paper expounds the advantages of the design institute as the EPC general contractor,including the leading advantages of design,the deep integration of design and construction,design technology innovation,etc..At the same time,it analyzes the problems and causes in the management process,and puts forward relevant suggestions,including change roles,win-win cooperation,optimize design,improve quality,train talents and perfect mechanism.The conclusion of this paper can provide reference for other EPC management of railway projects.
作者 胡刚 Hu Gang(China Railway Design Corporation,Tianjin 300308,China)
出处 《山西建筑》 2021年第5期177-179,共3页 Shanxi Architecture
关键词 EPC总承包 盐通铁路 中国铁设 项目管理 EPC mode Yancheng-Nantong railway CRDC project management
  • 相关文献

参考文献4

二级参考文献11

共引文献28

同被引文献32

引证文献6

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部