期刊文献+

天津中信城市广场首开区地下室结构设计 被引量:3

Structural design of basement in the First Phase Project of Tianjin CITIC City Plaza
下载PDF
导出
摘要 天津中信城市广场首开区地下室平面尺寸为528m×73m,为超长地下结构,采用逆作法施工。桩基方案选型优化确定采用框架柱与临时立柱相结合的"一柱一桩"方案,对逆作结构连接的关键节点进行了分析,考虑了超长结构的温度效应,并采取相应的设计措施。工程监测结果表明,结构沉降均匀稳定,楼板未出现明显的温度裂缝,达到了设计预期。 The plan size of the basement in the First Phase Project of Tianjin CITIC City Plaza is 528 m×73 m. It is an ultra-long basement structure and was constructed by top-down construction method. The selection of pile foundation scheme was optimized and determined to adopt the "one column one pile" scheme combining frame columns and temporary columns. The key nodes of the top-down structure connection were analyzed, the temperature effect of the ultra-long structure was considered, and corresponding design measures were taken. The engineering monitoring results show that the structural settlement is uniform and stable, and there are no obvious temperature cracks in the floor, which meet the design expectations.
作者 娄泽方 张达生 袁强 温四清 王海 LOU Zefang;ZHANG Dasheng;YUAN Qiang;WEN Siqing;WANG Hai(CITIC General Institute of Architectural Design and Research Co.,Ltd.,Wuhan 430014,China)
出处 《建筑结构》 CSCD 北大核心 2021年第1期36-40,93,共6页 Building Structure
关键词 天津中信城市广场 逆作法 超长结构 一柱一桩 连接节点 温度效应 Tianjin CITIC City Plaza top-down construction method ultra-long structure one column one pile connection joint temperature effect
  • 相关文献

参考文献2

二级参考文献2

  • 1GB50011-2001建筑抗震设计规范[S].2008年版.北京:中国建筑工业出版社,2008.
  • 2中华城工程场地地震安全性评价报告[R].武汉:武汉地震工程研究院,2009.

共引文献11

同被引文献21

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部