摘要
DDC桩是近几年才运用于机场地基处理,施工质量取决于施工技术装备水平、施工工艺、施工方法和现场控制,通过在重庆武隆民用机场飞行区场道工程的实践应用,就施工方法、工艺流程和施工管理进行探讨。
DDC pile is only used in airport foundation treatment in recent years.The construction quality depends on the level of construction technology and equipment,construction technology,construction method and site control.Through the practical application of the project in the airfield area of Chongqing Wulong civil airport,the construction method,process and construction management are discussed.